Standard Plans

Series 100 and 200 - General Notes and Street Improvement Standards

</tr ></tr ></tr >


Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Standard Plans118 documents

  • General Notes (5/1/2008)
    document seq 0.00
    100 / 1 of 4
  • General Notes(5/1/2008)
    document seq 0.00
    100/2 of 4
  • General Notes(5/1/2008)
    document seq 0.00
    100/3 of 4
  • General Notes(5/1/2008)
    document seq 0.00
    100/4 of 4
  • Major Arterial Highway Typical Section(5/1/2008)
    document seq 0.00
    101
  • Primary Arterial Highway Typical Section(5/1/2008)
    document seq 0.00
    102
  • Secondary Arterial Highway Typical Section(5/1/2008)
    document seq 0.00
    103
  • Local Streets Typical Section(5/1/2008)
    document seq 0.00
    104
  • Knuckle Details(3/21/1994)
    document seq 0.00
    105
  • Cul-de-sac(3/21/1994)
    document seq 0.00
    106
  • Alley Approach(5/1/2008)
    document seq 0.00
    107/1of3
  • Alley Section(5/1/2008)
    document seq 0.00
    107/ 2 of 3
  • Alley Section(5/1/2008)
    document seq 0.00
    107 / 3 of 3
  • Landscape Med. Moisture Barrier Detail (5/1/2008)
    document seq 0.00
    108
  • Trench / Pavement Repair Detail(5/1/2008)
    document seq 0.00
    109
  • Steel Plate Bridging (5/1/2008)
    document seq 0.00
    110
  • Material Storage in R/W (5/1/2008)
    document seq 0.00
    111
  • Curb Section(5/1/2008)
    document seq 0.00
    201
  • Curb & Gutter Section(5/1/2008)
    document seq 0.00
    202
  • Corner Bus Turnout(5/1/2008)
    document seq 0.00
    203/ 1 of 2
  • Mid-Block Bus Turnout(5/1/2008)
    document seq 0.00
    203/2 of 2
  • Residential Lot Drain(5/1/2008)
    document seq 0.00
    204
  • Concrete Cross Gutter(5/1/2008)
    document seq 0.00
    205
  • 16' Concrete Cross Gutter(5/1/2008)
    document seq 0.00
    206
  • Sidewalk and Parkway(5/1/2008)
    document seq 0.00
    207
  • Residential Driveway Approach(5/1/2008)
    document seq 0.00
    209
  • Commercial and Industrial Drive Approach(5/1/2008)
    document seq 0.00
    211 /1 of 2
  • Commercial and Industrial Drive Approach(5/1/2008)
    document seq 0.00
    211/ 2 of 2
  • Utility conduit locations in r/w(5/1/2008)
    document seq 0.00
    215 /1 of 3
  • Utility conduit locations in r/w(5/1/2008)
    document seq 0.00
    215/ 2 of 3
  • Utility conduit locations in r/w(5/1/2008)
    document seq 0.00
    215/ 3 of 3
  • Private Street Rolled Curb(5/1/2008)
    document seq 0.00
    216
  • Parkway Repair for Utility Box Installation(5/1/2008)
    document seq 0.00
    217
  • 3' Longitudinal Gutter(5/1/2008)
    document seq 0.00
    218
  • Survey Monument (3/21/1994)
    document seq 0.00
    219
  • Micro-Trenching(3/1/2022)
    document seq 0.00
    220
  • Storm Drain Design Criteria(5/1/2008)
    document seq 0.00
    300/1 of 2
  • Storm Drain Design Criteria(5/1/2008)
    document seq 0.00
    300/1 of 2
  • Curb Inlet Catch Basin and Local Depression (5/1/2008)
    document seq 0.00
    301/1 of 2
  • Curb Inlet Catch Basin and Local Depression (5/1/2008)
    document seq 0.00
    301/2of 2
  • Apron Depression Catch Basin(5/1/2008)
    document seq 0.00
    302
  • Catch Basin Frame & Cover(5/1/2008)
    document seq 0.00
    303
  • Junction Structure Type "A"(5/1/2008)
    document seq 0.00
    304 /1 of 2
  • Junction Structure Type "A"(5/1/2008)
    document seq 0.00
    304 /2 of 2
  • Junction Structure Type "B"(5/1/2008)
    document seq 0.00
    305/1 of 2
  • Junction Structure Type "B"(5/1/2008)
    document seq 0.00
    305/2 of 2
  • 48" Reinforced Concrete Manhole (5/1/2008)
    document seq 0.00
    306
  • Standard Storm Drain Manhole Cover & Frame(5/1/2008)
    document seq 0.00
    307
  • Reinforced Concrete Pipe Bedding Detail(3/21/1994)
    document seq 0.00
    308
  • Catch Basin Reinforcement(3/21/1994)
    document seq 0.00
    309/1 of 2
  • Catch Basin Reinforcement(5/1/2008)
    document seq 0.00
    309 /2 of 2
  • Concrete Collar(3/21/1994)
    document seq 0.00
    310
  • Junction Structure Type "C"(3/21/1994)
    document seq 0.00
    311
  • Parkway Culvert Type "A"(5/1/2008)
    document seq 0.00
    312 /1 of 4
  • Parkway Culvert Type "B"(5/1/2008)
    document seq 0.00
    312/ 2 of 4
  • Parkway Culvert Type "C"(5/1/2008)
    document seq 0.00
    312 /3 of 4
  • Parkway Culver Details & Notes(5/1/2008)
    document seq 0.00
    312 /4 of 4
  • Junction Structure Type "D"(5/1/2008)
    document seq 0.00
    313/ 1 of 2
  • Junction Structure Type "D"(5/1/2008)
    document seq 0.00
    313/ 2 of 2
  • Junction Structure Type "E"(5/1/2008)
    document seq 0.00
    314 /1 of 2
  • Junction Structure Type "E"(3/21/1994)
    document seq 0.00
    314 /2 of 2
  • H.D.P.E. Pipe Bedding Details (5/1/2008)
    document seq 0.00
    315 /1 of 2
  • H.D.P.E. Pipe Bedding Details (5/1/2008)
    document seq 0.00
    315/2 of 2
  • Street Sign Assembly(4/14/2016)
    document seq 0.00
    401/ 5 pages
  • Single/Dual Pedestals(3/15/1994)
    document seq 0.00
    402/ 6 pages
  • Temporary Sign Trestle (3/15/1994)
    document seq 0.00
    403
  • Non-Illuminated Street Name Sign(3/15/1994)
    document seq 0.00
    404/3pages
  • Parking Restrictions on Private Property(3/15/1994)
    document seq 0.00
    405
  • Typical Crosswalk Installation (6/23/2008)
    document seq 0.00
    406
  • Typical Turn Lane Marking Details (6/23/2008)
    document seq 0.00
    407
  • Typical "Stop" Legend and Limit Line Placement (6/23/2008)
    document seq 0.00
    408
  • Bike Lane Legend (4/14/2016)
    document seq 0.00
    409
  • Type Q and R7 Installation(11/4/2015)
    document seq 0.00
    410
  • Modifications to City & Edison Street Lighting Systems(6/23/2008)
    document seq 0.00
    411/1 of 2
  • Modifications to City & Edison Street Lighting Systems(6/23/2008)
    document seq 0.00
    411/2 of 2
  • Telephone Booth Installations in Public ROW (3/15/1994)
    document seq 0.00
    412/1 of 2
  • Bus Shelter Installations (Electrical) (3/15/1994)
    document seq 0.00
    412/2 of 2
  • End of Road Barricade(3/15/1994)
    document seq 0.00
    413
  • Wood Retaining Wall Barricade(3/15/1994)
    document seq 0.00
    414
  • Parallel Parking Stalls(6/23/2008)
    document seq 0.00
    417/2 of 2
  • Pull Box Stabilization For Street Lights (6/23/2008)
    document seq 0.00
    422/1 of 2
  • Pull Box Stabilization For Street Lights(6/23/2008)
    document seq 0.00
    422/2 of 2
  • Traffic Signal Block Number Sign(3/19/2001)
    document seq 0.00
    425
  • Sewer Facility Design Criteria (3/1/2008)
    document seq 0.00
    500/1 of 7
  • Sewer Facility Design Criteria (5/1/2008)
    document seq 0.00
    500/2 of 7
  • Sewer Facility Design Criteria (5/1/2008)
    document seq 0.00
    500/3 of 7
  • Sewer Facility Design Criteria (5/1/2008)
    document seq 0.00
    500/4 of 7
  • Sewer Facility Design Criteria (5/1/2008)
    document seq 0.00
    500/5 of 7
  • Sewer Facility Design Criteria (5/1/2008)
    document seq 0.00
    500/6 of 7
  • Sewer Facility Design Criteria (5/1/2008)
    document seq 0.00
    500/7 of 7
  • Basic Separation from Domestic Water and Reclaimed Water(5/1/2008)
    document seq 0.00
    501
  • V.C.P. Pipe Bedding Details(5/1/2008)
    document seq 0.00
    502
  • P.V.C. Pipe Bedding Details(5/1/2008)
    document seq 0.00
    503
  • Manhole Concrete Base (5/1/2008)
    document seq 0.00
    504
  • Precast reinforced Concrete Manhole(5/1/2008)
    document seq 0.00
    505
  • Typical Sewer Lateral(5/1/2008)
    document seq 0.00
    507
  • Standard Clean-out Section(5/1/2008)
    document seq 0.00
    508
  • Sewer Chimney Pipe(5/1/2008)
    document seq 0.00
    509
  • Cut in Wye Connection(5/1/2008)
    document seq 0.00
    510
  • Sewer Saddle Connection(5/1/2008)
    document seq 0.00
    511
  • Steel Casing Pipe(5/1/2008)
    document seq 0.00
    512
  • Standard Manhole Cover and Frame(5/1/2008)
    document seq 0.00
    513
  • Concrete Encasement Type 'A', 'B' and 'C'(5/1/2008)
    document seq 0.00
    514
  • Gas Flap(5/1/2008)
    document seq 0.00
    515
  • Tapping Sleeve for "Lined" Sewer Main (5/1/2008)
    document seq 0.00
    516
  • Trenchless Pipeline rehabilitation Design Criteria(5/1/2008)
    document seq 0.00
    517 /1 of 2
  • Trenchless Pipeline rehabilitation Design Criteria (5/1/2008)
    document seq 0.00
    517/ 2 of 2
  • Water Standard Plans
    document seq 0.00
    600-638
  • Landscape Standard Plans
    document seq 0.00
    701-733
  • General Notes for Small Cell Installations (SCI)(11/16/2017)
    document seq 0.00
    800
  • SCI (Equipment Underground)- Case 1(11/16/2017)
    document seq 0.00
    801/1 of 2
  • SCI (Equipment Underground)- Case 1(11/16/2017)
    document seq 0.00
    801/ 2 of 2
  • SCI ("Stealth" Pole)- Case 2(11/16/2017)
    document seq 0.00
    802/1 of 2
  • SCI ("Stealth" Pole)- Case 2(11/16/2017)
    document seq 0.00
    802/2 of 2
  • SCI ("Semi Stealth" Pole)- Case 3(11/16/2017)
    document seq 0.00
    803/1 of 2
  • SCI ("Semi-Stealth" Pole)- Case 3(11/16/2017)
    document seq 0.00
    803/2 of 2
  • SCI ("Sleek" Pole)- Case 4(11/16/2017)
    document seq 0.00
    804/1 of 2
  • SCI ("Sleek" Pole)- Case 4(11/16/2017)
    document seq 0.00
    804/2 of 2