Project Name: Huntington Beach Lofts

Project Location: 7302-7400 Center Avenue, at the Southeast Corner of Gothard Street and Center Avenue.


Project Description:The Huntington Beach Lofts project involves the construction of a mixed-use residential and commercial development. The project consists of four levels of housing over three levels of parking. The retail component would be on the ground level adjacent to the two levels of above grade parking. Overall, the project would be six stories in height and consist of approximately 385 residential units and up to 10,000 square feet of retail uses. Outdoor amenities would include a pool and spa area, fire pit and movie projection area. Indoor amenities would include a fitness center, business center, conference room, and clubhouse.


Entitlements approved include Environmental Impact Report (EIR 07-004), Zoning Map Amendment (ZTA 07-004), General Plan Amendment (GPA-07-003), Zoning Map Amendment (ZMA-07-001) and Conditional Use Permit (CUP 07-043) by Planning Commission September 20, 2008; upheld by City Council November 10, 2008.


An Environmental Impact Report (EIR) was prepared for the project, analyzing the potentially significant environmental impacts of the proposed project and identifying mitigation measures to reduce or eliminate these impacts. PBS&J Associates was retained to prepare all studies and documentation necessary to comply with the provisions of the California Environmental Quality Act (CEQA), as well as conducting an impact assessment, development of mitigation measures, review for CEQA adequacy, attendance at public meetings, responses to comments, coordination between City staff and the project team.

Project Planner: Tess Nguyen, Associate Planner, (714) 374-1744, [email protected].

Public Documents

 

DRAFT ENVIRONMENTAL IMPACT REPORT (July 8, 2008)

Volume I

Cover/Table of Contents

Chapter 1 -- Introduction

Chapter 2 -- Summary

Chapter 3 -- Project Description

Chapter 4 -- Environmental Analysis

Chapter 5 -- Other CEQA Considerations

Chapter 6 -- Alternatives to the Project

Chapter 7 -- Report Preparers

Volume II

Cover/Table of Contents

Appendix A -- Initial Study/Notice of Preparation

Appendix B -- Air Quality Data

Appendix C -- Biological Data

Appendix D -- Cultural Data

Appendix E -- Geological Data

Appendix F -- Phase I Environmental Study

Appendix G -- Noise Data

Appendix H -- Traffic Impact Analysis

Appendix I -- Utilities/Hydrology Data

FINAL ENVIRONMENTAL IMPACT REPORT (September 15, 2008)

Volume III

Cover/Table of Contents

Chapter 8 -- Introduction to the Final EIR

Chapter 9 -- Changes to the Draft EIR

Chapter 10 -- Responses to Comments

 

Initial Study

Notice of Availability for Initial Study

Initial Study

Attachment 2: Preliminary Grading Plan

Attachment 3: Elevation Plan


Did you know?


The Police Department provides FREE security checks of your home while you are on vacation!  This service is provided courtesy of the HBPD Retired Senior Volunteer Program (RSVP).  Sign up online for this free service.

Contact Information

City of Huntington Beach
Planning Division
2000 Main Street
Huntington Beach, CA
Phone: (714) 536-5271
Fax: (714) 374-1648
Email:

Community Development
Planning Division
Building Division
Accessory Dwelling Units (ADUs)
Agendas
Design Guidelines
FAQs
Flood Information
General Plan
General Plan Update
Affordable Housing Viewer
Housing Element Update
Group Homes and Sober Living Homes
Major Projects
News & Publications
Planning Staff
Short-Term Rentals in HB
Specific Plans
Streamline Surf City
Zoning Code
Zoning Viewer
Back to Top  up-arrow