Volume I: Specific Plan Draft EIR
Chapter 3 -- Project Descriptions
Chapter 4 -- Environmental Analysis
4.4 -- Cultural and Paleontological Resources
4.6 -- Hazards and Hazardous Materials
4.7 -- Hydrology and Water Quality
4.10 -- Population and Housing
4.14 -- Utilities and Service Systems
Chapter 5 -- Other CEQA Considerations
Chapter 6 -- Alternatives to Proposed Project
Volume II: Specific Plan Draft EIR Appendices
Appendix A -- Initial Study/Notice of Preparation and Comments on the IS/NOP
Appendix B -- Air Quality Calculations
Appendix C -- Sensitive Species
Appendix F1 -- Traffic Impact Analysis
Appendix F2 -- McFadden Avenue/Sugar Drive Traffic Evaluation
Appendix G -- Water Supply Assessment
Appendix H -- Sewer Analysis Report
Appendix I -- Climate Change Data
The Draft Environmental Impact Report (EIR) for the Beach Boulevard and Edinger Avenue Corridors Study will be available for a forty-five day public review and comment period commencing on Friday, August 28, 2009 through Monday, October 12, 2009. The Draft EIR analyzes the potential environmental impacts associated with the proposed Beach and Edinger Corridors Specific Plan. The Specific Plan, which encompasses 459 acres, is intended to implement a clear and comprehensive vision for growth and change along Beach Boulevard and Edinger Avenue. A public meeting on the Draft EIR will be held on September 30, 2009 at 6:00 P.M. at Central Library, Rooms C & D, 7111 Talbert Avenue. Written comments on the draft EIR should be provided to Rosemary Medel, Associate Planner at 2000 Main Street, Huntington Beach, CA, 92648 or rmedel@surfcity-hb.org.